Notas de prensa

Eurofins Iproma begins the construction works of its central laboratory

The new laboratory, which has a surface area of ​​3,859 m2 distributed over two floors, will have the most advanced [...]

Published on March 10th, 2021 at 8:26 AM

Eurofins Iproma begins the construction works of its central laboratory
  • The new laboratory, which has a surface area of ​​3,859 m2 distributed over two floors, will have the most advanced analysis technology.
  • This new laboratory aims to be a reference center in environmental control, as well as a logistics center for Eurofins’ environmental division in Spain.

Eurofins | IPROMA begins the construction works of its new central laboratory, located on the street Lituania, nº 8, Poligono del Transporte II in Castellon de la Plana. The new laboratory, which has a surface area of ​​3,859 m2 distributed over two floors, will have the most advanced analysis technology.

The LEAN principles applied in the design of the laboratory will have a direct impact on the improvement of results delivery times, as well as on the productive capacity. This new laboratory aims to be a reference center in environmental control throughout the national territory at the disposal of its clients.

A total of 6 companies presented offer in phase 1 to apply for the tender contract for the construction of the new facilities, being only 3 the finalist companies in phase 2, and where the company finally awarded was GIMECONS.

The new facilities will become the benchmark logistics center for Eurofins’ Environment Division in Spain.

The new laboratory is expected to be operational in August 2022.

Central Laboratory, iLEANlab, New Laboratory